Skip to content
Redbird
New architectural shingle roof installed on a home near Baton Rouge

Full tear-off · GAF Master Elite

Roof Replacement in Baton Rouge, LA

A written, itemised estimate within 24 hours, squares, system, decking, warranty and the monthly payment if you want it.

Rated by homeowners across Greater Baton RougeLicensed Louisiana contractor (LSLBC)

Roof replacement

What you're actually buying when you replace a roof

We replace roofs across Baton Rouge, Baker, Zachary, Central and Denham Springs, architectural shingle, standing seam metal and tile, with our own crews and a full tear-off every time.

A replacement is four decisions, not one: what comes off, what the decking needs, which system goes on, and how the attic breathes afterwards. Get ventilation wrong in Louisiana heat and a 30-year shingle ages like a 15-year one, which is why we size ridge and intake venting to the attic volume rather than copying whatever was there.

Typical architectural shingle replacements in Greater Baton Rouge land between $12,000 and $24,000. Pitch, layers, decking and access move that range, and metal sits above it. Your estimate shows each line so you can see exactly which of those applies to your house.

Signs you need this

When a repair stops being the right answer

  • Roof is past 18–20 years old
  • Widespread granule loss, not one slope
  • Multiple repairs on the same roof already
  • Decking is soft or previously water-damaged
  • Hail bruising across several slopes
  • You're selling and the roof is a closing condition

Homeowners here already trust us with the roof.

One licensed contractor for the roof, the water damage underneath it and the room you have to rebuild. Free inspection, written estimate, and a straight answer about whether you need a repair or a replacement.

  • GAF Master Elite, top 2% of GAF contractors
  • Free on-site inspection, about 45 minutes
  • Written estimate within 24 hours
  • Roof, water mitigation and interior rebuild in one contract

Prefer to talk? 225-719-6600. We answer the phone.

What can we look at?

Step 1 of 2

Takes about 30 seconds.

Type of work

Materials and options

Systems we install

  • GAF Timberline HDZ architectural shingle with algae resistance
  • Malarkey Emerald Pro and CertainTeed systems on request
  • 24-gauge standing seam metal for wind and longevity
  • Synthetic underlayment on the whole roof, not just valleys
  • Ice-and-water membrane at valleys, chimneys and penetrations
  • Golden Pledge 50-year non-prorated coverage where eligible

Our process

How the work actually goes

  1. 1

    Inspection

    Roof and attic, photographed, with measurements taken for squares and pitch.

  2. 2

    System selection

    We price two or three systems side by side so you're choosing, not guessing.

  3. 3

    Permit and delivery

    We pull the permit, stage materials and confirm your install window.

  4. 4

    Install and warranty

    One to two days on site, then registration of your manufacturer warranty.

Financing

A new roof is a monthly number, not a lump sum

Most homeowners replace a roof once. Paying for it in one go is the part that stalls the decision, so we quote the monthly figure alongside the total and let you decide which one you're solving for.

Rates and terms come from our lending partner, we publish the real numbers once you've seen the estimate, never a teaser rate.

Typical replacement

$180–$320/mo

Range shown for common Greater Baton Rouge roof sizes with approved credit. Your estimate carries your actual figure, your term and your rate.

Financing terms subject to credit approval. Your rate, term and monthly figure are shown in writing on your estimate before you commit to anything.

Reviews

What customers actually say

Each review is tagged with the work we did and the city we did it in.

"I can not say enough good about them! They exude top tier service excellence and absolute professionalism! From the efficiency of the workmanship during the installation to the concern and peace we felt from the company owner throughout the process. I HIGHLY recommend this company for all of your needs!"
David M. · Greater Baton Rouge
"Simply the best experience ever! Ahead of time, top quality install, attention to detail - EVERYTHING we could want from a contractor! Thanks!"
Randy W. · Greater Baton Rouge
"I would definitely recommend this service to everyone I know. If you're looking for honest people that do excellent work and are affordable, look no further."
Delisha H. · Greater Baton Rouge

The wedge

If water already got inside, the ceiling is part of the job

Redbird holds the general contracting licence, so drying, drywall, paint and flooring go on the same contract as the roof instead of waiting on another company's schedule.

Service areas

Where we work

Our crews run daily out of Zachary across Baton Rouge, Baker, Zachary, Central and Denham Springs, plus the surrounding parishes.

Questions

Answers before you call

By squares of roof area, pitch, the number of layers coming off, decking condition and the system you choose. We show each of those lines on the estimate so you can see what moves the number.

Get a straight answer about your roof this week.

Free inspection, written estimate within 24 hours, and no obligation either way.